All Categories
seamless tracks adhesive paves the way   juhuan foam adhesive empowers the 100 year -0

Solution

Home >  Solution

Seamless Tracks, Adhesive Paves the Way - Juhuan Foam Adhesive Empowers the 100-Year

Jul.01.2025

Project of Xi'an Metro Line 2

Strict Engineering Challenges

As a backbone line of the city, Xi'an Metro Line 2 faces frequent vibration of track gaps, extreme temperature differences (-10°C to 40°C), and long-term waterproof sealing requirements. Traditional filling materials are prone to aging and cracking, leading to a sharp increase in maintenance costs.

Innovative Sealing Solution

• Juhuan Nest Foam Adhesive System

• Utilizing European pre-expansion technology, it expands 80% immediately after spraying, quickly filling the rail joint gaps with an accuracy of ±0.5mm, eliminating the risk of thermal expansion and contraction. With a closed-cell rate exceeding 95% and an elastic compressive strength maintained at 3.2 MPa, it provides a flexible buffer layer for a 60,000-ton rail network, reducing vibration transmission by 60%.

• Ultra-low temperature adaptability: Curing time ≤ 45 minutes at -30℃, ensuring continuous construction in winter.

西安地铁2号线.png

Get a Free Quote

Our representative will contact you soon.
Email
Mobile/WhatsApp
Name
Company Name
Message
0/1000

Copyright © 2025 by Shandong Juhuan New Material Technology Co., Ltd.  -  Privacy policy